Open questions · as of Nov 20, 2026
Open questions officials have not answered
These are questions public offices have not answered, as of Nov 20, 2026. Number 1 is the most urgent. For each one, this page shows who must answer, the record that would answer it, when it was asked, and what came back. Some are asked here for the first time. A question is not a finding.
The short version
- 9 ranked questions, and 3 more to ask.
- Two dates matter: CHRO meets on Dec 9, 2026 to vote on reopening David's two cases. The current approval period of ABI Waiver I ends Dec 31, 2026.
- Each fact links to its record. Emails that are not published say so.
1. CMS: who approved closing David's fraud report in May 2026, and who did the conflict review CMS promised on March 27, 2026?
- Who must answer
- CMS Center for Program Integrity: Tim Helms, Director, Center for Program Integrity .
- SafeGuard Services LLC, CMS's Northeast fraud contractor (NE UPIC): Ross Heflin, Program Director, UPIC NE .
- SafeGuard Services LLC (NE UPIC): Jeffrey D. Hartley, NE UPIC Medicaid Fraud Manager .
- The record that would answer it
- The closure record: the date, the stage (screening or investigation), who decided, and why. If it was an investigation, CMS's written approval to close it. The record of the conflict review CMS promised. The list of what the contractor reviewed.
- When it was asked
- Mar 26, 2026: David raised the conflict with SafeGuard and with CMS's Medicaid Integrity Program.
- Nov 10, 2026: he asked SafeGuard for the reference number, the closing date and the CMS office that approved the closure.
- Nov 12, 2026: he asked again.
- Nov 19, 2026: he asked DOJ's fraud office, GAO and the House Oversight Committee to find out.
- What came back
- CMS, Mar 27, 2026: "Your concerns below will be escalated for review." (CMS reply)
- SafeGuard, Nov 10, 2026: "the matter was closed in May 2026." It said the CMS lead from that time "has since retired from CMS." No reference number. No CMS approver named. (SafeGuard replies)
- SafeGuard, Nov 19, 2026: "I have no additional information to provide beyond what has previously been communicated." (third reply)
- CMS: no answer found on who closed the report or who did the conflict review.
- Status
- No answer found as of Nov 20, 2026 (238 days after CMS's March 27 reply).
Why it matters now
- CMS's own manual (Pub. 100-15, chapter 3): at the screening stage, the contractor closes a lead itself and must record the date, the action and the reason. Once a matter is an investigation, the contractor must ask CMS to close it. (Same owner: CMS's rule) (CMS Transmittal 13494, sections 3.3 and 3.5 (cms.gov))
- One investment firm, Veritas Capital, owns both Gainwell (Connecticut's Medicaid claims system) and Peraton, the parent of SafeGuard. (Same owner: who is who)
- 238 days have passed since CMS wrote that the concerns "will be escalated for review" (as of Nov 20, 2026). (CMS reply)
2. Which federal office has reviewed David's reports on the merits?
- Who must answer
- HHS Office for Civil Rights (OCR): Paula M. Stannard, Director, Office for Civil Rights .
- HHS Office for Civil Rights (OCR): Susan M. Pezzullo Rhodes, Regional Manager .
- U.S. Department of Justice, Civil Rights Division, Disability Rights Section.
- The record that would answer it
- Any decision on the merits of David's reports. If there is none, a written answer on which office, if any, will review them.
- When it was asked
- First published here, Nov 20, 2026, as one question.
- Status
- First published here, Nov 20, 2026.
Why it matters now
- U.S. Justice Department, Civil Rights Division: DOJ's own records list 46 of David's reports. All 46 are marked CLOSED. (DOJ Civil Rights reports)
- HHS Office for Civil Rights: 13 complaint numbers in the records reviewed (Aug 2023 to Sep 2025). OCR's letters give an outcome for 11. None of the 11 reports an investigation or a finding. (HHS OCR complaints)
- U.S. Office of Special Counsel: 8 case numbers, all closed (Dec 2024 to Dec 2025). Reasons on record: lack of jurisdiction (DI-25-001176, where OSC noted David is not a federal employee, and MA-26-000331); missing information (DI-25-002060); no Hatch Act activity alleged (HA-25-000338, HA-25-000388). This site lists no reason for the other 3 (Dec 9, 2024). (Control numbers)
- Two state findings did decide the merits: Connecticut's CHRO found "no reasonable cause" on Jan 13 and Jan 22, 2026. (CHRO's two findings)
3. How many people did each ABI waiver actually serve each year from 2022 to 2026, and what keeps enrollment below the approved yearly maximum while people wait?
- Who must answer
- Connecticut Department of Social Services (DSS): William Halsey, Medicaid Director .
- Connecticut DSS, Community Options: Christine M. Weston, Director, Community Options Unit .
- CMS Division of HCBS Operations and Oversight: George P. Failla, Jr., Director, Division of HCBS Operations and Oversight .
- The record that would answer it
- The CMS-372(S) reports for ABI Waiver I (CT.0302) and ABI Waiver II (CT.1085), 2022 to 2026: how many people each waiver served. DSS's monthly slot, enrollment and waitlist reports. The written reason for any limit below the approved maximum.
- When it was asked
- Nov 13, 2023: David asked DSS for its ABI waitlist records, including counts and wait times.
- What came back
- DSS, Nov 13, 2023: a receipt, then a note that one part was already in his Sep 26, 2023 request, "projected to take over a year to complete." No counts were in either reply (saved copies in David's mailbox; not published). (Records requested)
- Status
- No counts given as of Nov 20, 2026.
Why it matters now
- ABI Waiver II (CT.1085.R02.00, effective Dec 1, 2024), Table B-3-a: the yearly maximum of people served is 315 in year 1 and 349 in year 2 (Dec 2025 to Nov 2026), rising to 451 in year 5. (ABI II waiver, page 23 (medicaid.gov, ZIP)) (Count check)
- ABI Waiver I (CT.0302.R05.05, approved effective May 9, 2025), Tables B-3-a and B-3-b: the yearly maximum for 2026 is 283, and 283 is also the most it may serve at any one time in 2026. (DSS waiver applications page)
- DSS slide, Dec 9, 2025, page 29 (counts on one day): ABI I had 234 active participants, 0 pending or waiting, and "Intake is frozen." ABI II had 280 active, 1 pending and 70 on the waitlist. Together: 514 active. (DSS slide, page 29 (portal.ct.gov))
- DSS written answers for the Appropriations subcommittee meeting of Mar 4, 2026: ABI II, "71 individuals, estimated 5-year wait"; ABI I, "Closed to new enrollment." The document gives no as-of date. (DSS answers (cga.ct.gov))
- A yearly maximum is not a count of open slots, and a one-day count is not a yearly total. The CMS-372(S) reports would show the real yearly numbers. This site has not found them online. (Count check)
4. Before CMS added modification P00036 ($35,425,268.07) to SafeGuard's Northeast task order on Oct 30, 2026, did it write any conflict review of the owner SafeGuard shares with Gainwell?
- Who must answer
- CMS contracting office for task order HHSM500T0001: Contracting officer (name not shown on USAspending).
- CMS Center for Program Integrity: Tim Helms, Director, Center for Program Integrity .
- The record that would answer it
- Any written organizational conflict of interest (OCI) review or mitigation plan for task order HHSM500T0001 since the shared ownership began; the P00036 contract file.
- When it was asked
- First published here, Nov 20, 2026.
- Status
- First published here, Nov 20, 2026.
Why it matters now
- USAspending, task order HHSM500T0001 (checked Nov 20, 2026): modification_number "P00036"; action_date "2026-10-30"; action_type "B", "SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE"; federal_action_obligation 35425268.07, that is $35,425,268.07. (USAspending award page)
- Veritas Capital owns Gainwell (Connecticut's Medicaid claims system) and Peraton, the parent of SafeGuard. (Same owner: who is who)
5. Before ABI Waiver I's approval period ends Dec 31, 2026, what proof did CMS accept that planned services were delivered, and what were the "CMS’s determinations" in its April 7, 2026 email?
- Who must answer
- CMS Center for Medicaid and CHIP Services: Dan Brillman, Deputy Administrator and Director, Center for Medicaid and CHIP Services .
- CMS Division of HCBS Operations and Oversight: George P. Failla, Jr., Director, Division of HCBS Operations and Oversight .
- CMS Boston Regional Office.
- The record that would answer it
- CMS's review for the ABI Waiver I renewal; the State's proof that services were delivered; the CMS-372 reports; the written "determinations."
- When it was asked
- Nov 5, 2026: David asked CMS Boston for the status of the review it called still open on Mar 13, 2026.
- What came back
- CMS Boston, Mar 13, 2026: "Your case has not been closed and is currently still being reviewed." (What CMS did)
- CMS's HCBS office, Apr 7, 2026: "While we understand that you may not be in agreement with CMS’s determinations, we strongly encourage you to continue to engage with the Connecticut Department of Social Services." It did not say what the determinations were. (What CMS did)
- No answer to the Nov 5, 2026 request was found.
- Status
- No answer found as of Nov 20, 2026.
- Deadline
- Dec 31, 2026: the current ABI Waiver I approval period ends.
Why it matters now
- ABI Waiver I's current approval period began Jan 1, 2022 and runs 5 years; year 5 is 2026 (CT.0302.R05.05, pages 1 and 28-29). DSS posted a renewal draft for public comment in August 2026. (DSS waiver applications page) (Count check)
- Connecticut's approved ABI Waiver II checks delivery in a sample of participant records (Appendix D, measure D5). (Same owner: what David asks) (ABI II waiver (medicaid.gov, ZIP))
- CMS wrote on Apr 7, 2026: "all communications from CMS will be provided in writing, using clear and accessible language." (What CMS did)
6. After a hospital or rehab stay, who must update the care plan, check equipment, and give the provider a written discharge plan before ABI waiver services restart?
- Who must answer
- Connecticut DSS, Community Options: Christine M. Weston, Director, Community Options Unit .
- The record that would answer it
- DSS's written steps for restarting ABI waiver services after a hospital or rehab stay, and who approves the updated care plan.
- When it was asked
- First published here, Nov 20, 2026, as a rule for the whole program.
- Status
- First published here, Nov 20, 2026.
Why it matters now
- ABI Waiver II (CT.1085.R02.00), page 127: "A review of the person-centered plan is done at least annually and any time there is a significant status change or hospitalization." (ABI II waiver (medicaid.gov, ZIP))
- Page 131: "The staff of DSS' Community Options unit, Connecticut's Medicaid agency, directly approves the developed service plan." (ABI II waiver (medicaid.gov, ZIP))
- Page 133 says something different: changes to a care plan are "subject to review by the case manager's supervisor" and do not need DSS approval. (ABI II waiver (medicaid.gov, ZIP))
7. Before CHRO votes on Dec 9, 2026, will it give David the staff summary and recommendation, tell him what the Commissioners will receive, and decide his other 7 accommodation requests?
- Who must answer
- Connecticut Commission on Human Rights and Opportunities (CHRO): Tanya A. Hughes, Executive Director .
- CHRO, ADA coordinator.
- CHRO, Legal Division.
- The record that would answer it
- The staff summary and recommendation for the Dec 9 meeting; the list of documents going to the Commissioners for cases 2510183 and 2510184; a written decision on each of the 7 requests.
- When it was asked
- Oct 30, 2026: David asked CHRO for 12 records and written answers.
- Nov 10, 2026: he answered CHRO's Nov 5 reply and asked it to confirm what goes to the Commissioners.
- What came back
- CHRO's ADA coordinator, Nov 5, 2026: email access was already given; his written statement "can be provided" to the Commissioners; live typed questions can be arranged. His other 7 requests "must be directed to the appropriate personnel." The reply did not decide them. (Accommodation requests)
- No further answer found as of Nov 20, 2026.
- Status
- Partly answered Nov 5, 2026; 7 requests not decided.
- Deadline
- Dec 9, 2026: CHRO meeting and vote on reopening.
Why it matters now
- CHRO's Nov 5, 2026 reply moved the vote from Nov 18 to Dec 9, 2026. (CHRO: reopening)
- CHRO's two findings, Jan 13, 2026 (case 2510184) and Jan 22, 2026 (case 2510183), both found "no reasonable cause." (CHRO's two findings)
8. Where are DSS's written grievance procedure and grievance records for its home and community-based waivers, which federal rule 42 CFR 441.301(c)(7) requires from July 9, 2026? And what happened to David's grievance of Aug 13, 2025 and his complaint of Apr 27, 2026?
- Who must answer
- Connecticut Department of Social Services (DSS): Andrea Barton Reeves, Commissioner of the Department of Social Services .
- Connecticut DSS, Community Options: Christine M. Weston, Director, Community Options Unit .
- Connecticut DSS, Office of Legal Counsel: Michael Slitt, Staff Attorney .
- The record that would answer it
- DSS's written grievance policy for its HCBS waivers; its record of grievances under 42 CFR 441.301(c)(7); the written outcome of David's two complaints.
- When it was asked
- Aug 13, 2025: David filed a written grievance with the DSS Commissioner and with Community Options.
- Apr 27, 2026: he filed a written complaint with the Commissioner's office about provider choice.
- What came back
- Community Options, Aug 14, 2025: "I am acknowledging your complaint below." (saved copy in David's mailbox; not published)
- No written outcome was found for either complaint.
- Status
- Receipt only (Aug 14, 2025); no outcome found as of Nov 20, 2026.
Why it matters now
- Federal rule 42 CFR 441.301(c)(7): "The State must establish a procedure under which a beneficiary may file a grievance" about these services. It also says: "The State must maintain records of grievances." The applicability date: "States must comply with the requirement at paragraph (c)(7) of this section beginning 2 years after July 9, 2024." That is July 9, 2026. (42 CFR 441.301(c)(7) (eCFR))
- Connecticut's approved ABI Waiver II (CT.1085.R02.00, Appendix F-3, pages 164-165) is marked "No. This Appendix does not apply" for a state grievance or complaint system. (ABI II waiver (medicaid.gov, ZIP))
- David's two complaints were filed before July 9, 2026, when the rule's grievance duties began.
9. What did HHS-OIG do with David's three Task Force fraud reports, and where is OCR's findings letter on his remanded complaint about CMS?
- Who must answer
- HHS Office of Inspector General (HHS-OIG): T. March Bell, Inspector General .
- HHS Office for Civil Rights (OCR): Paula M. Stannard, Director, Office for Civil Rights .
- HHS Office for Civil Rights (OCR): Deborah E. Kolodner, Investigator .
- The record that would answer it
- HHS-OIG's complaint numbers and any referral for reports TFF-2026-540108637375, TFF-2026-523240294272 and TFF-2026-848029331203. OCR's findings letter, or a written extension, for OCR transactions 25-614156 and 26-669246.
- When it was asked
- Nov 4, 2026: David wrote to the OCR investigator.
- Nov 5, 2026: he asked for the status of the remanded investigation.
- Nov 19, 2026: he wrote to the OCR investigator again.
- HHS-OIG: first asked here, Nov 20, 2026.
- What came back
- OCR, Apr 27, 2026: "Thank you very much for providing the information that we needed to proceed with the remanded investigation." Since then: read receipts only. (Accommodation requests)
- HHS-OIG: no complaint number found for any of the three reports.
- Status
- No OCR decision found; 207 days since OCR's Apr 27, 2026 email (as of Nov 20, 2026).
Why it matters now
- OCR sent David's complaint about CMS's communications back to a field office in January 2026 (OCR transaction 25-614156). (Accommodation requests)
- The Task Force site said it routes report TFF-2026-540108637375 to HHS-OIG. (Nov 19, 2026 reports)
Also ask
These matter too. They are not ranked.
Do CMS officials Kim Brandt and Dan Brillman have written recusals or waivers that cover Gainwell, other Veritas companies or Connecticut Medicaid, and what do they cover?
- Who must answer
- HHS Office of the General Counsel, Ethics Division (the Designated Agency Ethics Official).
- The record that would answer it
- Any written recusal or screening memo for Kim Brandt; Dan Brillman's Dec 16, 2025 conflict-of-interest waiver and his Dec 4, 2025 certificate of divestiture (OGE-2025-274).
- When it was asked
- Nov 19, 2026: in David's reports to DOJ's fraud office, GAO, the House Oversight Committee and HHS OCR.
- What came back
- No answer found as of Nov 20, 2026.
- Status
- No answer found as of Nov 20, 2026.
Why it matters now
- Senate lobbying (LDA) filings list Kimberly Brandt, now CMS Deputy Administrator and Chief Operating Officer, as a lobbyist for client Gainwell (fka HMS) in every quarter from Q1 2021 to Q4 2024. The last filing that names her was posted Jan 16, 2025. (Same owner: two CMS officials) (Kimberly Brandt)
- The U.S. Office of Government Ethics index lists for "Brillman, Daniel" a "Certificate of Divestiture OGE-2025-274" (Dec 4, 2025) and a "Conflict of Interest Waiver" (Dec 16, 2025). Their contents are not public. (Same owner: two CMS officials) (Dan Brillman)
- These are facts, not findings. Neither official is accused of anything.
Which signed contract lets GT Independence keep running DSS's ABI provider directory after its contract's stated end, and on what date did DSS's October 2019 new-client suspension of ABI Resources end?
- Who must answer
- Connecticut Department of Social Services (DSS): Andrea Barton Reeves, Commissioner of the Department of Social Services .
- Connecticut DSS, Community Options: Christine M. Weston, Director, Community Options Unit .
- The record that would answer it
- Any amendment or new contract after contract 23DSS7113MD; DSS's record of the date the 2019 suspension ended.
- When it was asked
- The contract question: first published here, Nov 20, 2026.
- What came back
- No DSS record of the suspension's end date has been found. (Proof and gaps)
- Status
- Open as of Nov 20, 2026.
Why it matters now
- The executed contract 23DSS7113MD says: "This Contract is in effect from 9/1/2023 through 8/31/2026." The state's Purchase of Service reports list a term ending 8/21/2026. (GT Independence contract)
- On Nov 10, 2026, DSS attached GT Independence's online provider directory to a records reply and wrote: "The Department considers this request to have been fulfilled." (DSS records reply)
- DSS's letter of Oct 10, 2019 suspended ABI Resources from new ABI waiver and MFP clients. (Early Warning Record, Oct 2019)
What did DSS's Special Investigations unit (referred Dec 13, 2023) and the Attorney General's Government Fraud Section (forwarded Mar 20, 2025) find?
- Who must answer
- Connecticut DSS, Office of Quality Assurance, Special Investigations Division.
- Connecticut Office of the Attorney General: William Tong, Attorney General .
- Connecticut Office of the Attorney General, Government Fraud Section: Chief of the Government Fraud Section.
- The record that would answer it
- Each office's case number, what it reviewed, and its written result.
- When it was asked
- The referrals were made by the offices themselves (Dec 13, 2023 and Mar 20, 2025).
- What came back
- DSS, Dec 13, 2023: it sent David's concerns to its Special Investigations unit "for further investigation." (National: who got the warnings)
- Attorney General's office, Mar 20, 2025: it wrote that it forwarded his complaint to the chief of its Government Fraud Section for review. (AG referral)
- No result from either office has been found.
- Status
- No result found as of Nov 20, 2026.
How this list was checked
- Each date, number, name, title and quote was checked on Nov 20, 2026 against the record it cites.
- Titles come from official lists or the person's own signed letter or email, with the date shown.
- Some other questions are still being checked. They will be added only after they are verified.
- The same list as data: open-questions.json.
About this page
Made by Claude from public records and David's saved emails. A question is not a finding. Naming an official shows who holds the record. It does not say the person did anything wrong.
Is something on this page wrong or out of date? Prepare a source-supported correction. This site has no form that sends a request.
© 2026 David Medeiros. All rights reserved.
Question 7: dated qualification and update, November 23, 2026
Dated qualification, November 23, 2026. Question 7 above is kept as written for November 20, 2026.
Vote wording. Question 7 asks what happens “Before CHRO votes on Dec 9, 2026” and lists the deadline as a meeting and vote. CHRO Legal’s November 5, 2026 notices scheduled consideration of both reopening requests for the December 9, 2026 Commission meeting at 2 p.m. Eastern. A vote, a reopening, a reversal or a finished hearing is not guaranteed and has not happened. Where question 7 says the vote was moved, read: the scheduled consideration was set for December 9, 2026.
Asked again. On November 22, 2026, David sent his November 10 questions again (pc-43cfdab39263). The receipt that day (pc-2d560e23bcfb) is a mail-relay record, not proof that anyone at CHRO read it.
CHRO’s answer, November 23, 2026 (both cases): “CHRO cannot provide the questions in advance”; no additional time outside the meeting; “Your materials will be sent” to the Commission members before December 9; “We do not currently have a grievance procedure”, with a DAS appeal route and a ten-day period after a denial described by CHRO (CHRO says it has not denied an accommodation; the period is not checked as law and no deadline is computed here); and CHRO asked which other requests David means.
Status now: partly answered on November 5 and November 23, 2026. Not answered in the records found: the staff summary and recommendation, the list of what goes to the Commissioners for each case, the date it goes, and a decision on the other requests. CHRO record update; CHRO records map.
Question 1: what CMS’s March 27, 2026 reply does and does not say (added November 23, 2026)
Added November 23, 2026. A filing is not a finding, and a receipt is not an investigation.
Qualifies: question 1 and “The record that would answer it”.
On March 27, 2026, CMS wrote: “Your concerns below will be escalated for review.” The reply’s email header ties it to David’s March 26 request, which raised an apparent conflict. The retained reply does not identify the reviewer, document a completed escalation, or say a conflict review was performed. The requested records are the actual transmittal, assignment, review and closure records.
Sources and context: What CMS did with the warnings · Questions for federal reviewers · November 19, 2026 one-page summary
Read these clarifications as JSON · November 23 corrections log